(!) Remember to enable push notifications to get important alerts directly on your phone.
You'll find enclosed notices in the elevators and on our floors to warn of construction noise in connection with the renovation of the dormitories in 2nd floor. The work is ongoing from 7 a.m. to 5 p.m., but they will limit noisy work to 9 a.m. to 5 p.m.
Work on the dorms will continue until opening on June 1, while work on rooms on the 3rd floor is set to be completed on Feb. 26.
20.09.23 - Shutdown of hot water tonight!
During this night, Thursday 21.09.23, between 01:00-03:00 we must shut off access to hot water in the building. NOTE! We ask you to be very careful that no taps are left open during this time period as this can cause problems (flooding) when the water is switched on again.
(We are warning for a long outage, but we belive the work goes faster. Unfortunately, we cannot guarantee this)
We therefore hope as many people as possible have the opportunity to extend their Christmas holiday and return after January3rd.
Those who are home on January 3 must prepare for these points:
All residents should prepare for the fridge/freezer to get hot! Empty the fridge/freezer of food items by January 3rd. If there is ice in the freezer, water may appear on the floor, so please do the following:
There will be personnel/caretakers at the building during the power outage, and Securitas has a telephone +47 90123952.
31.08.23 - Moving of the post room 01.09.23
11.08.23 - Construction work 14.08-31.12.23:
06.03.2023 - Geothermal energy well project in Københavngata 10